Scottish Power Networks (SPEN) operate in three large rural areas across North Wales, the Scottish Borders as well as supplying homes in Liverpool, Edinburgh and Glasgow.
Their network includes 30,000 substations, 40,000km of overhead line, and 65,000 of buried cable. As with all Distribution Network Operators, they have their own specification cables for connection to their part of the Grid, to be manufactured by G81-approved suppliers
SPEN cables are part of the wider DNO approved portfolio of UKPN, SSE, WPD, NPG and ENW cables in 11KV and 33KV
Earthmet offer a wide range of these cables, some from stock.
Please see the Datasheet on the downloads tab, If you a seeking a specific configuration that is not displayed please use the “Make an enquiry” form above and one of our agents will be in touch and advise